Question 470
At Brookside Manufacturing, the plant operations team is planning an industrial Ethernet modernization under a requirement for planned downtime and resilient cabling. Following a proposed correction, the change manager requires evidence for this original fault: Operations adds a downstream switch to a redundant MCLAG design but accidentally connects both access uplinks into the same peer. Which observation BEST demonstrates that the fix worked?
Explanation
Correct Answer
A peer outage leaves a live access path and the topology diagram matches actual port neighbors. This observation verifies the specific reported problem, Operations adds a downstream switch to a redundant MCLAG design but accidentally connects both access uplinks into the same peer. The intended correction was: Verify physical endpoint identity and distribute supported dual-homed links across intended MCLAG peers. It provides a directly testable outcome for the Brookside Manufacturing environment rather than treating a completed change ticket as proof.
Incorrect Answers
A test failure converges according to the documented supported protocol without duplicate forwarding. For Brookside Manufacturing, that measurement would support a separate technical case: A manufacturing network needs industrial redundancy, but the design assumes ordinary campus MCLAG alone satisfies a ring-protocol requirement. Its corresponding remedy is: Evaluate the product-supported industrial ring or redundancy mechanism for the exact FortiSwitch model and topology. The reported Brookside Manufacturing condition is Operations adds a downstream switch to a redundant MCLAG design but accidentally connects both access uplinks into the same peer. So the required outcome is: A peer outage leaves a live access path and the topology diagram matches actual port neighbors.
The operational port roles and peer health match the intended loop-safe redundant topology. For Brookside Manufacturing, that measurement would support a separate technical case: A two-tier FortiLink deployment has redundant links but STP blocks the wrong segment because the topology's control plane was not planned. Its corresponding remedy is: Review supported two-tier design, STP role and MCLAG behavior before changing link state. The reported Brookside Manufacturing condition is Operations adds a downstream switch to a redundant MCLAG design but accidentally connects both access uplinks into the same peer. So the required outcome is: A peer outage leaves a live access path and the topology diagram matches actual port neighbors.
Load and failure tests maintain forwarding targets without peer-link saturation or loss of synchronization. For Brookside Manufacturing, that measurement would support a separate technical case: A distribution tier has multiple MCLAGs but its interchassis link is too small for expected failover traffic. Its corresponding remedy is: Capacity-plan the peer interconnect and redundant ICL paths using supported model limits and traffic assumptions. The reported Brookside Manufacturing condition is Operations adds a downstream switch to a redundant MCLAG design but accidentally connects both access uplinks into the same peer. So the required outcome is: A peer outage leaves a live access path and the topology diagram matches actual port neighbors.