Question 440
At Brookside Manufacturing, the plant operations team is planning an industrial Ethernet modernization under a requirement for planned downtime and resilient cabling. After the switch change, operators must prove that they resolved: A FortiSwitch stack uses unmanaged intermediate Ethernet bridges that introduce unsupported control-path behavior. Which observation BEST demonstrates that the fix worked?
Explanation
Correct Answer
Managed switches appear in the intended topology and stay online after link-state changes. This observation verifies the specific reported problem, A FortiSwitch stack uses unmanaged intermediate Ethernet bridges that introduce unsupported control-path behavior. The intended correction was: Review supported FortiLink and stack topologies and remove or replace unapproved intermediate connectivity. It provides a directly testable outcome for the Brookside Manufacturing environment rather than treating a completed change ticket as proof.
Incorrect Answers
A peer outage leaves a live access path and the topology diagram matches actual port neighbors. For Brookside Manufacturing, that measurement would support a separate technical case: Operations adds a downstream switch to a redundant MCLAG design but accidentally connects both access uplinks into the same peer. Its corresponding remedy is: Verify physical endpoint identity and distribute supported dual-homed links across intended MCLAG peers. The reported Brookside Manufacturing condition is A FortiSwitch stack uses unmanaged intermediate Ethernet bridges that introduce unsupported control-path behavior. So the required outcome is: Managed switches appear in the intended topology and stay online after link-state changes.
All individual switches are visible in the controller topology and remain manageable through the intended cascade. For Brookside Manufacturing, that measurement would support a separate technical case: A remote campus has several cascaded FortiSwitches but the diagram omits required upstream FortiLink discovery behavior. Its corresponding remedy is: Use a supported multi-switch FortiLink cascade topology with appropriately configured inter-switch links. The reported Brookside Manufacturing condition is A FortiSwitch stack uses unmanaged intermediate Ethernet bridges that introduce unsupported control-path behavior. So the required outcome is: Managed switches appear in the intended topology and stay online after link-state changes.
Loss of one permitted uplink does not isolate managed switches or expose unwanted switching loops. For Brookside Manufacturing, that measurement would support a separate technical case: A branch relies on a single FortiLink cable even though the operational requirement is link-path redundancy. Its corresponding remedy is: Select an appropriate supported aggregate, standby or MCLAG-based FortiLink topology and test its failover. The reported Brookside Manufacturing condition is A FortiSwitch stack uses unmanaged intermediate Ethernet bridges that introduce unsupported control-path behavior. So the required outcome is: Managed switches appear in the intended topology and stay online after link-state changes.