Question 30
A payment processor cannot tolerate lengthy setup after loss of its main site. A secondary facility must already have functioning systems and synchronized operational data so processing can resume rapidly. Which recovery-site model is the closest fit?
Explanation
Correct Answer
A hot recovery site maintains infrastructure and data in a state suitable for rapid activation, subject to a tested failover plan. The readiness matches the requirement better than facilities that need equipment installation or lengthy recovery steps. The team should verify that the ready site includes necessary identity, network and third-party service dependencies. A data copy without tested application startup would not meet the rapid-resumption commitment.
Incorrect Answers
A cold site provides foundational facility capacity but requires hardware, software and data restoration before business processing can resume. That preparation time conflicts with a requirement for very rapid recovery.
An ordinary spare office lacks the prepared computing environment, network access and tested operational dependencies required to process payments. Office occupancy does not establish disaster-recovery readiness. Continuity requires functioning compute, network and synchronized data rather than simply an available room.
A warm site may speed up restoration compared with a cold facility, but outdated data and uncompleted configuration make it unsuitable for near-immediate payment resumption. The requirement calls for ready applications and synchronized data, consistent with a hot recovery site.