Exam Code: PK0-005

Exam Name CompTIA Project+

Certification Provider: CompTIA

Corresponding Certification: CompTIA Project+

CompTIA PK0-005 Bundle $44.99

100% CompTIA PK0-005 Guaranteed Success With Testking Training Materials

Get Real PK0-005 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

  • Questions & Answers

    PK0-005 Questions & Answers

    628 Questions & Answers

    The ultimate exam preparation tool, Questions & Answers mirrors the actual PK0-005 exam while allowing you to hone and measure every aspect of your test-taking ability.

  • PK0-005 Video Course

    PK0-005 Video Course

    159 Video Lectures

    PK0-005 Video Course is developed by CompTIA Professionals to help you pass the PK0-005 exam.

    Description

    This course will improve your knowledge and skills required to pass CompTIA Project+ exam.
  • Study Guide

    PK0-005 Study Guide

    682 PDF Pages

    Developed by industry experts, this 682-page guide spells out in painstaking detail all of the information you need to ace PK0-005 exam.

CompTIA Project+ (PK0-005) Practice Tests

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Total Cost: $194.97
Bundle Price: $149.98

Purchase Individually

  • Questions & Answers

    Questions & Answers

    628 Questions

    $124.99
  • PK0-005 Video Course

    Video Course

    159 Video Lectures

    $39.99
  • Study Guide

    Study Guide

    682 PDF Pages

    $29.99

CompTIA PK0-005 Practice Test 42

Question 410

For Brightstone Legal, the implementation team reports the following delivery problem: A sponsor claims a migration has a positive return without comparing estimated benefits to its acquisition and transition costs. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. The proposal separately identifies one-time asset purchases and ongoing maintenance or subscriptions.
  2. A sponsor can review expected value and costs before authorizing the initiative.
  3. The decision document includes recurring costs sensitivity and a documented recommendation.
  4. The business case shows the calculation inputs and an independently reproducible investment result.

Explanation

Correct Answer

D:

The business case shows the calculation inputs and an independently reproducible investment result. This is the relevant acceptance evidence because it tests whether the corrective action (Calculate and document return on investment using consistent cost and benefit assumptions.) fixed the original concern (A sponsor claims a migration has a positive return without comparing estimated benefits to its acquisition and transition costs.) at Brightstone Legal, rather than relying only on a task marked complete. The affected work concerns matter files and sensitive case records.

Incorrect Answers

A:

The proposal separately identifies one-time asset purchases and ongoing maintenance or subscriptions. This evidence would be useful for another condition (A project proposal counts the full cost of new hardware as recurring operating expense and ignores the capital purchase.) and its different action (Distinguish capital investment from operating expense in the financial justification.). At Brightstone Legal, it does not demonstrate the required project outcome: The business case shows the calculation inputs and an independently reproducible investment result.

B:

A sponsor can review expected value and costs before authorizing the initiative. This evidence would be useful for another condition (A proposed inventory application has no written business benefit or sponsor justification yet the team begins purchasing servers.) and its different action (Develop a business case linking the current operational problem to measurable future benefits.). At Brightstone Legal, it does not demonstrate the required project outcome: The business case shows the calculation inputs and an independently reproducible investment result.

C:

The decision document includes recurring costs sensitivity and a documented recommendation. This evidence would be useful for another condition (The business case lists only optimistic benefits and omits vendor lock-in and annual hosting obligations.) and its different action (Build a realistic cost-benefit analysis including lifecycle expense and delivery uncertainty.). At Brightstone Legal, it does not demonstrate the required project outcome: The business case shows the calculation inputs and an independently reproducible investment result.

Question 411

At Oceanview Payments, the delivery assessment finds: A sponsor claims a migration has a positive return without comparing estimated benefits to its acquisition and transition costs. Which project management action BEST addresses the particular issue?

  1. Calculate and document return on investment using consistent cost and benefit assumptions.
  2. Distinguish capital investment from operating expense in the financial justification.
  3. Develop a business case linking the current operational problem to measurable future benefits.
  4. Build a realistic cost-benefit analysis including lifecycle expense and delivery uncertainty.

Explanation

Correct Answer

A:

Calculate and document return on investment using consistent cost and benefit assumptions. This directly addresses the reported management gap: A sponsor claims a migration has a positive return without comparing estimated benefits to its acquisition and transition costs. For Oceanview Payments and its regulated card workflows and employee access, a useful verification outcome is: The business case shows the calculation inputs and an independently reproducible investment result.

Incorrect Answers

B:

Distinguish capital investment from operating expense in the financial justification. This choice addresses another specific project condition: A project proposal counts the full cost of new hardware as recurring operating expense and ignores the capital purchase. The actual issue at Oceanview Payments is: A sponsor claims a migration has a positive return without comparing estimated benefits to its acquisition and transition costs. That other intervention does not itself establish the required result: The business case shows the calculation inputs and an independently reproducible investment result.

C:

Develop a business case linking the current operational problem to measurable future benefits. This choice addresses another specific project condition: A proposed inventory application has no written business benefit or sponsor justification yet the team begins purchasing servers. The actual issue at Oceanview Payments is: A sponsor claims a migration has a positive return without comparing estimated benefits to its acquisition and transition costs. That other intervention does not itself establish the required result: The business case shows the calculation inputs and an independently reproducible investment result.

D:

Build a realistic cost-benefit analysis including lifecycle expense and delivery uncertainty. This choice addresses another specific project condition: The business case lists only optimistic benefits and omits vendor lock-in and annual hosting obligations. The actual issue at Oceanview Payments is: A sponsor claims a migration has a positive return without comparing estimated benefits to its acquisition and transition costs. That other intervention does not itself establish the required result: The business case shows the calculation inputs and an independently reproducible investment result.

Question 412

At Oceanview Payments, the delivery assessment finds: A sponsor claims a migration has a positive return without comparing estimated benefits to its acquisition and transition costs. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. The decision document includes recurring costs sensitivity and a documented recommendation.
  2. A sponsor can review expected value and costs before authorizing the initiative.
  3. The business case shows the calculation inputs and an independently reproducible investment result.
  4. The proposal separately identifies one-time asset purchases and ongoing maintenance or subscriptions.

Explanation

Correct Answer

C:

The business case shows the calculation inputs and an independently reproducible investment result. This is the relevant acceptance evidence because it tests whether the corrective action (Calculate and document return on investment using consistent cost and benefit assumptions.) fixed the original concern (A sponsor claims a migration has a positive return without comparing estimated benefits to its acquisition and transition costs.) at Oceanview Payments, rather than relying only on a task marked complete. The affected work concerns regulated card workflows and employee access.

Incorrect Answers

A:

The decision document includes recurring costs sensitivity and a documented recommendation. This evidence would be useful for another condition (The business case lists only optimistic benefits and omits vendor lock-in and annual hosting obligations.) and its different action (Build a realistic cost-benefit analysis including lifecycle expense and delivery uncertainty.). At Oceanview Payments, it does not demonstrate the required project outcome: The business case shows the calculation inputs and an independently reproducible investment result.

B:

A sponsor can review expected value and costs before authorizing the initiative. This evidence would be useful for another condition (A proposed inventory application has no written business benefit or sponsor justification yet the team begins purchasing servers.) and its different action (Develop a business case linking the current operational problem to measurable future benefits.). At Oceanview Payments, it does not demonstrate the required project outcome: The business case shows the calculation inputs and an independently reproducible investment result.

D:

The proposal separately identifies one-time asset purchases and ongoing maintenance or subscriptions. This evidence would be useful for another condition (A project proposal counts the full cost of new hardware as recurring operating expense and ignores the capital purchase.) and its different action (Distinguish capital investment from operating expense in the financial justification.). At Oceanview Payments, it does not demonstrate the required project outcome: The business case shows the calculation inputs and an independently reproducible investment result.

Question 413

Silver Cove Payments is delivering an IT initiative involving transaction data and fraud monitoring in a mixed Agile and predictive delivery environment. The team observes: A sponsor claims a migration has a positive return without comparing estimated benefits to its acquisition and transition costs. Which project management action BEST addresses the particular issue?

  1. Build a realistic cost-benefit analysis including lifecycle expense and delivery uncertainty.
  2. Develop a business case linking the current operational problem to measurable future benefits.
  3. Calculate and document return on investment using consistent cost and benefit assumptions.
  4. Distinguish capital investment from operating expense in the financial justification.

Explanation

Correct Answer

C:

Calculate and document return on investment using consistent cost and benefit assumptions. This directly addresses the reported management gap: A sponsor claims a migration has a positive return without comparing estimated benefits to its acquisition and transition costs. For Silver Cove Payments and its transaction data and fraud monitoring, a useful verification outcome is: The business case shows the calculation inputs and an independently reproducible investment result.

Incorrect Answers

A:

Build a realistic cost-benefit analysis including lifecycle expense and delivery uncertainty. This choice addresses another specific project condition: The business case lists only optimistic benefits and omits vendor lock-in and annual hosting obligations. The actual issue at Silver Cove Payments is: A sponsor claims a migration has a positive return without comparing estimated benefits to its acquisition and transition costs. That other intervention does not itself establish the required result: The business case shows the calculation inputs and an independently reproducible investment result.

B:

Develop a business case linking the current operational problem to measurable future benefits. This choice addresses another specific project condition: A proposed inventory application has no written business benefit or sponsor justification yet the team begins purchasing servers. The actual issue at Silver Cove Payments is: A sponsor claims a migration has a positive return without comparing estimated benefits to its acquisition and transition costs. That other intervention does not itself establish the required result: The business case shows the calculation inputs and an independently reproducible investment result.

D:

Distinguish capital investment from operating expense in the financial justification. This choice addresses another specific project condition: A project proposal counts the full cost of new hardware as recurring operating expense and ignores the capital purchase. The actual issue at Silver Cove Payments is: A sponsor claims a migration has a positive return without comparing estimated benefits to its acquisition and transition costs. That other intervention does not itself establish the required result: The business case shows the calculation inputs and an independently reproducible investment result.

Question 414

Silver Cove Payments is delivering an IT initiative involving transaction data and fraud monitoring in a mixed Agile and predictive delivery environment. The team observes: A sponsor claims a migration has a positive return without comparing estimated benefits to its acquisition and transition costs. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. The proposal separately identifies one-time asset purchases and ongoing maintenance or subscriptions.
  2. The business case shows the calculation inputs and an independently reproducible investment result.
  3. A sponsor can review expected value and costs before authorizing the initiative.
  4. The decision document includes recurring costs sensitivity and a documented recommendation.

Explanation

Correct Answer

B:

The business case shows the calculation inputs and an independently reproducible investment result. This is the relevant acceptance evidence because it tests whether the corrective action (Calculate and document return on investment using consistent cost and benefit assumptions.) fixed the original concern (A sponsor claims a migration has a positive return without comparing estimated benefits to its acquisition and transition costs.) at Silver Cove Payments, rather than relying only on a task marked complete. The affected work concerns transaction data and fraud monitoring.

Incorrect Answers

A:

The proposal separately identifies one-time asset purchases and ongoing maintenance or subscriptions. This evidence would be useful for another condition (A project proposal counts the full cost of new hardware as recurring operating expense and ignores the capital purchase.) and its different action (Distinguish capital investment from operating expense in the financial justification.). At Silver Cove Payments, it does not demonstrate the required project outcome: The business case shows the calculation inputs and an independently reproducible investment result.

C:

A sponsor can review expected value and costs before authorizing the initiative. This evidence would be useful for another condition (A proposed inventory application has no written business benefit or sponsor justification yet the team begins purchasing servers.) and its different action (Develop a business case linking the current operational problem to measurable future benefits.). At Silver Cove Payments, it does not demonstrate the required project outcome: The business case shows the calculation inputs and an independently reproducible investment result.

D:

The decision document includes recurring costs sensitivity and a documented recommendation. This evidence would be useful for another condition (The business case lists only optimistic benefits and omits vendor lock-in and annual hosting obligations.) and its different action (Build a realistic cost-benefit analysis including lifecycle expense and delivery uncertainty.). At Silver Cove Payments, it does not demonstrate the required project outcome: The business case shows the calculation inputs and an independently reproducible investment result.

Question 415

Crescent Education is delivering an IT initiative involving learning platforms and staff accounts under controlled release and records requirements. The team observes: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. Which project management action BEST addresses the particular issue?

  1. Review the existing statement of work and reconcile authorized outputs with the new proposal.
  2. Identify the intended client business owner and measurable value before committing discovery funds.
  3. Develop a business case linking the current operational problem to measurable future benefits.
  4. Document current-state and future-state comparisons tied to the intended business objective.

Explanation

Correct Answer

D:

Document current-state and future-state comparisons tied to the intended business objective. This directly addresses the reported management gap: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. For Crescent Education and its learning platforms and staff accounts, a useful verification outcome is: Stakeholders agree which process gap the proposed upgrade must close.

Incorrect Answers

A:

Review the existing statement of work and reconcile authorized outputs with the new proposal. This choice addresses another specific project condition: A client already has a binding statement of work but the project estimate quietly assumes additional deliverables outside it. The actual issue at Crescent Education is: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. That other intervention does not itself establish the required result: Stakeholders agree which process gap the proposed upgrade must close.

B:

Identify the intended client business owner and measurable value before committing discovery funds. This choice addresses another specific project condition: An executive asks for a new data platform although no stakeholder can identify who will use its output. The actual issue at Crescent Education is: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. That other intervention does not itself establish the required result: Stakeholders agree which process gap the proposed upgrade must close.

C:

Develop a business case linking the current operational problem to measurable future benefits. This choice addresses another specific project condition: A proposed inventory application has no written business benefit or sponsor justification yet the team begins purchasing servers. The actual issue at Crescent Education is: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. That other intervention does not itself establish the required result: Stakeholders agree which process gap the proposed upgrade must close.

Question 416

Crescent Education is delivering an IT initiative involving learning platforms and staff accounts under controlled release and records requirements. The team observes: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. A sponsor can review expected value and costs before authorizing the initiative.
  2. A named sponsor confirms who receives the outcome and what success would mean.
  3. The discovery record distinguishes contracted work from proposed additions requiring approval.
  4. Stakeholders agree which process gap the proposed upgrade must close.

Explanation

Correct Answer

D:

Stakeholders agree which process gap the proposed upgrade must close. This is the relevant acceptance evidence because it tests whether the corrective action (Document current-state and future-state comparisons tied to the intended business objective.) fixed the original concern (A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process.) at Crescent Education, rather than relying only on a task marked complete. The affected work concerns learning platforms and staff accounts.

Incorrect Answers

A:

A sponsor can review expected value and costs before authorizing the initiative. This evidence would be useful for another condition (A proposed inventory application has no written business benefit or sponsor justification yet the team begins purchasing servers.) and its different action (Develop a business case linking the current operational problem to measurable future benefits.). At Crescent Education, it does not demonstrate the required project outcome: Stakeholders agree which process gap the proposed upgrade must close.

B:

A named sponsor confirms who receives the outcome and what success would mean. This evidence would be useful for another condition (An executive asks for a new data platform although no stakeholder can identify who will use its output.) and its different action (Identify the intended client business owner and measurable value before committing discovery funds.). At Crescent Education, it does not demonstrate the required project outcome: Stakeholders agree which process gap the proposed upgrade must close.

C:

The discovery record distinguishes contracted work from proposed additions requiring approval. This evidence would be useful for another condition (A client already has a binding statement of work but the project estimate quietly assumes additional deliverables outside it.) and its different action (Review the existing statement of work and reconcile authorized outputs with the new proposal.). At Crescent Education, it does not demonstrate the required project outcome: Stakeholders agree which process gap the proposed upgrade must close.

Question 417

For Newbridge Charity, the business analyst reports the following delivery problem: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. Which project management action BEST addresses the particular issue?

  1. Identify the intended client business owner and measurable value before committing discovery funds.
  2. Document current-state and future-state comparisons tied to the intended business objective.
  3. Develop a business case linking the current operational problem to measurable future benefits.
  4. Review the existing statement of work and reconcile authorized outputs with the new proposal.

Explanation

Correct Answer

B:

Document current-state and future-state comparisons tied to the intended business objective. This directly addresses the reported management gap: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. For Newbridge Charity and its donation workflows and volunteer accounts, a useful verification outcome is: Stakeholders agree which process gap the proposed upgrade must close.

Incorrect Answers

A:

Identify the intended client business owner and measurable value before committing discovery funds. This choice addresses another specific project condition: An executive asks for a new data platform although no stakeholder can identify who will use its output. The actual issue at Newbridge Charity is: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. That other intervention does not itself establish the required result: Stakeholders agree which process gap the proposed upgrade must close.

C:

Develop a business case linking the current operational problem to measurable future benefits. This choice addresses another specific project condition: A proposed inventory application has no written business benefit or sponsor justification yet the team begins purchasing servers. The actual issue at Newbridge Charity is: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. That other intervention does not itself establish the required result: Stakeholders agree which process gap the proposed upgrade must close.

D:

Review the existing statement of work and reconcile authorized outputs with the new proposal. This choice addresses another specific project condition: A client already has a binding statement of work but the project estimate quietly assumes additional deliverables outside it. The actual issue at Newbridge Charity is: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. That other intervention does not itself establish the required result: Stakeholders agree which process gap the proposed upgrade must close.

Question 418

For Newbridge Charity, the business analyst reports the following delivery problem: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. A sponsor can review expected value and costs before authorizing the initiative.
  2. Stakeholders agree which process gap the proposed upgrade must close.
  3. A named sponsor confirms who receives the outcome and what success would mean.
  4. The discovery record distinguishes contracted work from proposed additions requiring approval.

Explanation

Correct Answer

B:

Stakeholders agree which process gap the proposed upgrade must close. This is the relevant acceptance evidence because it tests whether the corrective action (Document current-state and future-state comparisons tied to the intended business objective.) fixed the original concern (A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process.) at Newbridge Charity, rather than relying only on a task marked complete. The affected work concerns donation workflows and volunteer accounts.

Incorrect Answers

A:

A sponsor can review expected value and costs before authorizing the initiative. This evidence would be useful for another condition (A proposed inventory application has no written business benefit or sponsor justification yet the team begins purchasing servers.) and its different action (Develop a business case linking the current operational problem to measurable future benefits.). At Newbridge Charity, it does not demonstrate the required project outcome: Stakeholders agree which process gap the proposed upgrade must close.

C:

A named sponsor confirms who receives the outcome and what success would mean. This evidence would be useful for another condition (An executive asks for a new data platform although no stakeholder can identify who will use its output.) and its different action (Identify the intended client business owner and measurable value before committing discovery funds.). At Newbridge Charity, it does not demonstrate the required project outcome: Stakeholders agree which process gap the proposed upgrade must close.

D:

The discovery record distinguishes contracted work from proposed additions requiring approval. This evidence would be useful for another condition (A client already has a binding statement of work but the project estimate quietly assumes additional deliverables outside it.) and its different action (Review the existing statement of work and reconcile authorized outputs with the new proposal.). At Newbridge Charity, it does not demonstrate the required project outcome: Stakeholders agree which process gap the proposed upgrade must close.

Question 419

At Greenpeak Civic Services, the delivery assessment finds: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. Which project management action BEST addresses the particular issue?

  1. Identify the intended client business owner and measurable value before committing discovery funds.
  2. Develop a business case linking the current operational problem to measurable future benefits.
  3. Review the existing statement of work and reconcile authorized outputs with the new proposal.
  4. Document current-state and future-state comparisons tied to the intended business objective.

Explanation

Correct Answer

D:

Document current-state and future-state comparisons tied to the intended business objective. This directly addresses the reported management gap: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. For Greenpeak Civic Services and its citizen services and digital identity, a useful verification outcome is: Stakeholders agree which process gap the proposed upgrade must close.

Incorrect Answers

A:

Identify the intended client business owner and measurable value before committing discovery funds. This choice addresses another specific project condition: An executive asks for a new data platform although no stakeholder can identify who will use its output. The actual issue at Greenpeak Civic Services is: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. That other intervention does not itself establish the required result: Stakeholders agree which process gap the proposed upgrade must close.

B:

Develop a business case linking the current operational problem to measurable future benefits. This choice addresses another specific project condition: A proposed inventory application has no written business benefit or sponsor justification yet the team begins purchasing servers. The actual issue at Greenpeak Civic Services is: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. That other intervention does not itself establish the required result: Stakeholders agree which process gap the proposed upgrade must close.

C:

Review the existing statement of work and reconcile authorized outputs with the new proposal. This choice addresses another specific project condition: A client already has a binding statement of work but the project estimate quietly assumes additional deliverables outside it. The actual issue at Greenpeak Civic Services is: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. That other intervention does not itself establish the required result: Stakeholders agree which process gap the proposed upgrade must close.

Question 420

At Greenpeak Civic Services, the delivery assessment finds: A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. The discovery record distinguishes contracted work from proposed additions requiring approval.
  2. A sponsor can review expected value and costs before authorizing the initiative.
  3. Stakeholders agree which process gap the proposed upgrade must close.
  4. A named sponsor confirms who receives the outcome and what success would mean.

Explanation

Correct Answer

C:

Stakeholders agree which process gap the proposed upgrade must close. This is the relevant acceptance evidence because it tests whether the corrective action (Document current-state and future-state comparisons tied to the intended business objective.) fixed the original concern (A software upgrade is justified by new features but nobody has recorded the existing workflow problems or desired future process.) at Greenpeak Civic Services, rather than relying only on a task marked complete. The affected work concerns citizen services and digital identity.

Incorrect Answers

A:

The discovery record distinguishes contracted work from proposed additions requiring approval. This evidence would be useful for another condition (A client already has a binding statement of work but the project estimate quietly assumes additional deliverables outside it.) and its different action (Review the existing statement of work and reconcile authorized outputs with the new proposal.). At Greenpeak Civic Services, it does not demonstrate the required project outcome: Stakeholders agree which process gap the proposed upgrade must close.

B:

A sponsor can review expected value and costs before authorizing the initiative. This evidence would be useful for another condition (A proposed inventory application has no written business benefit or sponsor justification yet the team begins purchasing servers.) and its different action (Develop a business case linking the current operational problem to measurable future benefits.). At Greenpeak Civic Services, it does not demonstrate the required project outcome: Stakeholders agree which process gap the proposed upgrade must close.

D:

A named sponsor confirms who receives the outcome and what success would mean. This evidence would be useful for another condition (An executive asks for a new data platform although no stakeholder can identify who will use its output.) and its different action (Identify the intended client business owner and measurable value before committing discovery funds.). At Greenpeak Civic Services, it does not demonstrate the required project outcome: Stakeholders agree which process gap the proposed upgrade must close.