McAfee-Secured Website

Exam Bundle

Exam Code: N10-009

Exam Name CompTIA Network+

Certification Provider: CompTIA

Corresponding Certification: CompTIA Network+

CompTIA N10-009 Bundle $44.99

100% CompTIA N10-009 Guaranteed Success With Testking Training Materials

Get Real N10-009 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

  • Questions & Answers

    N10-009 Questions & Answers

    768 Questions & Answers

    The ultimate exam preparation tool, Questions & Answers mirrors the actual N10-009 exam while allowing you to hone and measure every aspect of your test-taking ability.

  • N10-009 Video Course

    N10-009 Video Course

    240 Video Lectures

    N10-009 Video Course is developed by CompTIA Professionals to help you pass the N10-009 exam.

    Description

    This course will improve your knowledge and skills required to pass CompTIA Network+ exam.
  • Study Guide

    N10-009 Study Guide

    128 PDF Pages

    Developed by industry experts, this 128-page guide spells out in painstaking detail all of the information you need to ace N10-009 exam.

CompTIA Network+ (N10-009) Practice Tests

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Total Cost: $194.97
Bundle Price: $149.98

Purchase Individually

  • Questions & Answers

    Questions & Answers

    768 Questions

    $124.99
  • N10-009 Video Course

    Video Course

    240 Video Lectures

    $39.99
  • Study Guide

    Study Guide

    128 PDF Pages

    $29.99

CompTIA N10-009 Practice Test 38

Question 370

A switch port unexpectedly forwards tagged frames from a guest laptop configured as an access endpoint. Which recommendation most directly resolves the documented network issue?

  1. Audit the physical topology and STP root/port roles before overriding loop prevention.
  2. Ensure VLAN 200 has an active eligible access or trunk port before expecting the SVI line protocol to rise.
  3. Force access mode and suitable VLAN and disable unwanted dynamic trunk negotiation.
  4. Create SVIs with the VLAN interfaces present and enable supported Layer 3 routing.

Explanation

Correct Answer

C:

This action addresses the specific requirement because access-port hardening limits unexpected trunk formation with endpoint devices. The independent acceptance check is: The guest cannot reach tagged internal VLANs while approved access traffic works.

Incorrect Answers

A:

This action addresses a different situation: Two access switches have redundant uplinks but spanning tree blocks both expected paths due to mis-wired loops. It would not directly resolve the current network requirement because access-port hardening limits unexpected trunk formation with endpoint devices.

B:

This action addresses a different situation: An SVI configured for VLAN 200 remains down even after an administrator enables the interface, and no operational switchport carries that VLAN. It would not directly resolve the current network requirement because access-port hardening limits unexpected trunk formation with endpoint devices.

D:

This action addresses a different situation: A campus needs its access VLANs routed through SVIs on a multilayer switch. It would not directly resolve the current network requirement because access-port hardening limits unexpected trunk formation with endpoint devices.

Question 371

A technician tries to route 172.16.1.10 via a public gateway despite the interface being in 172.16.0.0/12. Which next action best addresses the stated networking problem?

  1. Verify CIDR aggregation requires contiguous networks aligned to the intended supernet boundary.
  2. Divide the /24 into two /25 subnets and assign matching default gateways.
  3. Recognize 172.16.0.0/12 as RFC1918 private range and use appropriate private routing or NAT.
  4. Select a larger subnet than /28, such as /27, when the gateway needs a 15th usable IP.

Explanation

Correct Answer

C:

This action addresses the specific requirement because rFC1918 ranges include 10/8, 172.16/12 and 192.168/16. The independent acceptance check is: Local private traffic follows intended enterprise routes and any public egress is translated at the proper edge.

Incorrect Answers

A:

This action addresses a different situation: A /23 aggregate must cover exactly two adjacent /24 networks and engineers choose a non-aligned pair. It would not directly resolve the current network requirement because rFC1918 ranges include 10/8, 172.16/12 and 192.168/16.

B:

This action addresses a different situation: A /24 office subnet needs to split into two equal routed segments without overlapping usable addresses. It would not directly resolve the current network requirement because rFC1918 ranges include 10/8, 172.16/12 and 192.168/16.

D:

This action addresses a different situation: A remote office needs 14 host IPs but a /28 plan includes 14 endpoints plus one separate gateway. It would not directly resolve the current network requirement because rFC1918 ranges include 10/8, 172.16/12 and 192.168/16.

Question 372

A new copper cable tests open on pair 3-6 and the switch link stays down. What should the network administrator implement first to meet this requirement?

  1. Validate receive-power limits and use an approved attenuator or correct optic to avoid overload.
  2. Replace moisture-damaged cabling/terminations and protect the entrance from water.
  3. Correct TX-to-RX polarity and test both directions.
  4. Reterminate or replace the failed pair and verify all Ethernet pair continuity with a wiremap tester.

Explanation

Correct Answer

D:

This action addresses the specific requirement because an open conductor interrupts required signal paths and can prevent link negotiation. The independent acceptance check is: The wiremap passes and the port negotiates its intended speed.

Incorrect Answers

A:

This action addresses a different situation: A single-mode circuit receives far more optical power than its short-reach receiver allows after amplifier work. It would not directly resolve the current network requirement because an open conductor interrupts required signal paths and can prevent link negotiation.

B:

This action addresses a different situation: An outdoor cable develops errors after rain and technicians find corrosion inside a patch panel. It would not directly resolve the current network requirement because an open conductor interrupts required signal paths and can prevent link negotiation.

C:

This action addresses a different situation: A network rack uses two identical fiber pairs but one has transmit fibers crossed into transmit on the peer. It would not directly resolve the current network requirement because an open conductor interrupts required signal paths and can prevent link negotiation.

Question 373

A proposed fix requires resetting every switch in the building to test whether one access port is faulty. What acceptance result confirms the specified networking requirement is met?

  1. A controlled rollback or rule test confirms or rejects the suspected policy cause.
  2. The suspect port is isolated without disconnecting unrelated users.
  3. A second engineer can identify the actual trigger, recovery command and preventive control from the record.
  4. Full transaction tests succeed across every required service and prevention notes are recorded.

Explanation

Correct Answer

B:

The intended action is: Use a low-impact targeted test or escalate before taking disruptive action. This works because troubleshooting actions must balance diagnostic value against production risk.

Incorrect Answers

A:

This choice would test a different networking condition: A branch's outage coincides with a firewall policy change and the engineer has three competing theories. Its related action is: Test the most likely, minimally disruptive theory with evidence and a rollback plan.

C:

This choice would test a different networking condition: A site-to-site VPN starts working after a restart, and the ticket is closed without capturing cause or lessons. Its related action is: Document evidence, action, outcome and prevention steps in the incident record.

D:

This choice would test a different networking condition: A firewall rule change restores traffic but the technician only tests the initiating host, not the dependent application workflow. Its related action is: Verify end-to-end application function and downstream dependencies before closure.

Question 374

A 110-meter permanent copper run repeatedly fails 1-Gbps certification. Which recommendation most directly resolves the documented network issue?

  1. Shorten/restructure the horizontal link or add a compliant active distribution point.
  2. Correct the pinout to a consistent approved T568A or T568B scheme at both ends.
  3. Install matched, vendor-supported optics for the same wavelength and fiber type.
  4. Repair or replace the defective connector and verify return-loss specifications.

Explanation

Correct Answer

A:

This action addresses the specific requirement because standard copper Ethernet channel limits generally target 100 meters. The independent acceptance check is: A certification test passes the correct category limits for the final compliant run.

Incorrect Answers

B:

This action addresses a different situation: A cable tester reports pairs 1-2 and 3-6 swapped at one end after an office relocation. It would not directly resolve the current network requirement because standard copper Ethernet channel limits generally target 100 meters.

C:

This action addresses a different situation: A switch's 10-Gbps port has the correct fiber but incompatible SR optics on one side and LR optics on the other. It would not directly resolve the current network requirement because standard copper Ethernet channel limits generally target 100 meters.

D:

This action addresses a different situation: A fiber patch has acceptable insertion loss but high optical return loss due to a damaged polished end. It would not directly resolve the current network requirement because standard copper Ethernet channel limits generally target 100 meters.

Question 375

An outdoor cable develops errors after rain and technicians find corrosion inside a patch panel. Which verification finding would support closing this network issue?

  1. A certification test passes the correct category limits for the final compliant run.
  2. Link errors cease in wet conditions and insulation inspection is clean.
  3. Return loss and interface errors meet the approved optical acceptance targets.
  4. The completed cable passes pair-map and transmission tests.

Explanation

Correct Answer

B:

The intended action is: Replace moisture-damaged cabling/terminations and protect the entrance from water. This works because water ingress increases loss and can short or corrode contacts.

Incorrect Answers

A:

This choice would test a different networking condition: A 110-meter permanent copper run repeatedly fails 1-Gbps certification. Its related action is: Shorten/restructure the horizontal link or add a compliant active distribution point.

C:

This choice would test a different networking condition: A fiber patch has acceptable insertion loss but high optical return loss due to a damaged polished end. Its related action is: Repair or replace the defective connector and verify return-loss specifications.

D:

This choice would test a different networking condition: A cable tester reports pairs 1-2 and 3-6 swapped at one end after an office relocation. Its related action is: Correct the pinout to a consistent approved T568A or T568B scheme at both ends.

Question 376

An employee receives an email urging immediate VPN password verification through an unfamiliar link. Which recommendation most directly resolves the documented network issue?

  1. Combine targeted social engineering awareness with safer authentication and secure credential storage.
  2. Limit trunking/native VLAN exposure and validate access-port VLAN hopping protections.
  3. Recognize phishing, report it through the approved channel and verify the request out of band.
  4. Enable DHCP snooping with trusted uplinks and deny server replies on untrusted access ports.

Explanation

Correct Answer

C:

This action addresses the specific requirement because social engineering exploits trust and urgency rather than a network protocol flaw. The independent acceptance check is: The simulated phish is reported without employees entering credentials into the fake portal.

Incorrect Answers

A:

This action addresses a different situation: A phishing simulation reveals passwords written on sticky notes near user workstations. It would not directly resolve the current network requirement because social engineering exploits trust and urgency rather than a network protocol flaw.

B:

This action addresses a different situation: A compromised switch trunk sends double-tagged frames designed to cross an unintended VLAN boundary. It would not directly resolve the current network requirement because social engineering exploits trust and urgency rather than a network protocol flaw.

D:

This action addresses a different situation: Clients obtain a different DNS resolver and router from a rogue DHCP server plugged into an office switch. It would not directly resolve the current network requirement because social engineering exploits trust and urgency rather than a network protocol flaw.

Question 377

Nearby 2.4-GHz APs use overlapping channels and users report high retransmissions in the same corridor. Which next action best addresses the stated networking problem?

  1. Enforce trusted server certificate validation in supplicants and correct RADIUS/EAP provisioning.
  2. Select a narrower channel width where survey evidence favors reuse over peak PHY rate.
  3. Plan nonoverlapping 2.4-GHz channels and appropriate transmit power based on a survey.
  4. Align directional antennas for a point-to-point link using appropriate regulatory power and fade margin.

Explanation

Correct Answer

C:

This action addresses the specific requirement because overlapping-channel interference degrades airtime for nearby radio cells. The independent acceptance check is: Channel utilization and retry rates fall in the affected corridor under equivalent client load.

Incorrect Answers

A:

This action addresses a different situation: A WPA2-Enterprise SSID uses a RADIUS certificate that clients do not validate. It would not directly resolve the current network requirement because overlapping-channel interference degrades airtime for nearby radio cells.

B:

This action addresses a different situation: A crowded 5-GHz office increases channel width to 160 MHz and sees fewer viable nonoverlapping channels. It would not directly resolve the current network requirement because overlapping-channel interference degrades airtime for nearby radio cells.

D:

This action addresses a different situation: Two warehouses 400 meters apart have clear line of sight and need a stable wireless bridge. It would not directly resolve the current network requirement because overlapping-channel interference degrades airtime for nearby radio cells.

Question 378

A branch PoE switch powers cameras until all IR LEDs turn on at night, then several cameras reboot. Select the most defensible networking decision for this case.

  1. Calculate the switch PoE power budget against total worst-case device demand and add capacity.
  2. Select appropriate port-side intake/exhaust direction and hot/cold aisle placement.
  3. Document the intermediate distribution frame and its cross-connect to the main distribution frame.
  4. Route the fiber in protected pathways with appropriate bend radius and strain relief.

Explanation

Correct Answer

A:

This action addresses the specific requirement because device port count alone does not guarantee sufficient total PoE watts. The independent acceptance check is: All cameras run at peak night power with no PoE-denied events.

Incorrect Answers

B:

This action addresses a different situation: A top-of-rack switch exhausts hot air toward cold-aisle server intakes. It would not directly resolve the current network requirement because device port count alone does not guarantee sufficient total PoE watts.

C:

This action addresses a different situation: An IDF on an upper floor connects horizontal cable runs but its uplink to MDF is unlabeled. It would not directly resolve the current network requirement because device port count alone does not guarantee sufficient total PoE watts.

D:

This action addresses a different situation: A new fiber run passes directly through an unprotected door hinge and repeatedly fails inspection. It would not directly resolve the current network requirement because device port count alone does not guarantee sufficient total PoE watts.

Question 379

A building cable passes continuity but gives intermittent link loss whenever a door closes on the cable. Which next action best addresses the stated networking problem?

  1. Match compatible speed/duplex configuration or restore correct autonegotiation.
  2. Diagnose pair twist integrity and termination quality, then recertify or replace the link.
  3. Repair or replace the defective connector and verify return-loss specifications.
  4. Correct the mechanical pinch and replace damaged cable while preserving bend radius.

Explanation

Correct Answer

D:

This action addresses the specific requirement because stress can cause intermittent conductor or optical faults not evident in a static wiremap. The independent acceptance check is: Repeated door operation no longer changes link state or error counters.

Incorrect Answers

A:

This action addresses a different situation: A switch port negotiates half duplex while the host uses full duplex and many late collisions appear. It would not directly resolve the current network requirement because stress can cause intermittent conductor or optical faults not evident in a static wiremap.

B:

This action addresses a different situation: A cable label says Cat6 but the run's near-end crosstalk fails at high frequency. It would not directly resolve the current network requirement because stress can cause intermittent conductor or optical faults not evident in a static wiremap.

C:

This action addresses a different situation: A fiber patch has acceptable insertion loss but high optical return loss due to a damaged polished end. It would not directly resolve the current network requirement because stress can cause intermittent conductor or optical faults not evident in a static wiremap.

Question 380

Two trunk peers use different native VLANs, allowing untagged frames to land in the wrong segment. What is the most appropriate network configuration or troubleshooting action for this requirement?

  1. Create SVIs with the VLAN interfaces present and enable supported Layer 3 routing.
  2. Mark and queue trusted voice traffic using a consistent switch QoS policy.
  3. Set matching native VLAN policy on both ends and limit unused VLAN exposure.
  4. Find the duplicate/looping connection and correct the physical or virtual switching path.

Explanation

Correct Answer

C:

This action addresses the specific requirement because native VLAN mismatches can misclassify untagged traffic and create control-plane risks. The independent acceptance check is: The mismatch warning clears and untagged test frames map consistently.

Incorrect Answers

A:

This action addresses a different situation: A campus needs its access VLANs routed through SVIs on a multilayer switch. It would not directly resolve the current network requirement because native VLAN mismatches can misclassify untagged traffic and create control-plane risks.

B:

This action addresses a different situation: A voice phone needs priority during a saturated trunk but VLAN tagging alone does not guarantee QoS. It would not directly resolve the current network requirement because native VLAN mismatches can misclassify untagged traffic and create control-plane risks.

D:

This action addresses a different situation: A data center switch reports MAC address flapping between two access ports for the same host address. It would not directly resolve the current network requirement because native VLAN mismatches can misclassify untagged traffic and create control-plane risks.