Question 560
At fictional Summitfall Markets, the security infrastructure review board is reviewing the multi-region production environment before an external compliance review. The verified design deficiency under discussion is: A webhook sends every transient IPS alert to a SOAR playbook, triggering thousands of duplicate containment actions during a noisy scanner test. This is a second deliberately RELATED but separately described hypothetical organization for the SAME underlying source issue. Assume no additional unrelated faults beyond the stated scenario. Which repeatable governance or technical check most directly limits recurrence of this same problem? Select one writer-proposed best answer for this UNOFFICIAL study draft.
Explanation
Writer-intended answer: D — qualified review pending
Correct Answer
Track playbook execution volume and test event-storm behavior before production rule changes. Event-driven automation must handle repeated delivery, out-of-order events and noisy sources without multiplying destructive actions.
Incorrect Answers
Monitor model performance drift and document when human override decisions are permitted. AI confidence estimates are not proof of correctness; validation must include operational context and both error directions. The focused ongoing check is: Track playbook execution volume and test event-storm behavior before production rule changes.
Track drift by region and keep a versioned known-attack regression suite. Statistical baselines can shift after legitimate topology changes, requiring evaluation rather than unconditional retraining. To prevent recurrence of this specific issue, track playbook execution volume and test event-storm behavior before production rule changes.
Review model provider settings, data lineage and role-based retrieval after every new assistant feature. AI integrations create data processors and information flows that must enforce the same confidentiality requirements as other systems. The more directly relevant preventive control is: Track playbook execution volume and test event-storm behavior before production rule changes.