Question 460
At fictional Dawnmont Construction, the cloud service protection group is reviewing the business-critical application architecture during a security design refresh. The verified design deficiency under discussion is: A new business system moved into production after its project manager marked the risk register complete but no security control effectiveness assessment was performed. This is a second deliberately RELATED but separately described hypothetical organization for the SAME underlying source issue. Assume no additional unrelated faults beyond the stated scenario. Which repeatable governance or technical check most directly limits recurrence of this same problem? Select one writer-proposed best answer for this UNOFFICIAL study draft.
Explanation
Writer-intended answer: D — qualified review pending
Correct Answer
Link system changes and assessment evidence to periodic reauthorization milestones. It guards against the problem described by this principle: The existence of a risk register alone does not substitute for evaluating implemented controls before accepting residual risk.
Incorrect Answers
Monitor per-identity failed-authentication trends and replay distributed attack patterns after policy changes. Credential stuffing is distributed across sources, so source-only rate limits do not capture repeated account targeting. The more directly relevant preventive control is: Link system changes and assessment evidence to periodic reauthorization milestones.
Review regional transfer maps and retention permissions when data pipelines are modified. Data protection obligations concern data subjects and processing context, not only whether the destination is technically encrypted. The focused ongoing check is: Link system changes and assessment evidence to periodic reauthorization milestones.
Test segmentation and update scope whenever payment services or management paths change. Payment environment scope depends on connectivity and impact on cardholder data security, not a label attached to one database. To prevent recurrence of this specific issue, link system changes and assessment evidence to periodic reauthorization milestones.