Question 420
A construction company sends a supervisor to an unfamiliar overseas project with no country threat briefing or emergency contact plan. The manager proposes this correction: Prepare a location-specific risk briefing, reliable communications, approved routes and emergency support options. Which ongoing control would BEST reduce recurrence of this specific failure?
Explanation
Correct Answer
Refresh destination intelligence and traveler check-in plans when conditions change. This sustains the corrective step — prepare a location-specific risk briefing, reliable communications, approved routes and emergency support options. — and targets the weakness: Travel risk was not assessed against destination threats and the traveler's assignment.
Incorrect Answers
This routine protects against: Communication equipment alone does not establish worker accountability or timely rescue. For the described failure, the relevant recurring check is: Refresh destination intelligence and traveler check-in plans when conditions change.
The proposed safeguard is intended for: Prior authorization is being treated as proof of current eligibility without checking intervening changes. The reported issue originates from: Travel risk was not assessed against destination threats and the traveler's assignment. The targeted prevention is: Refresh destination intelligence and traveler check-in plans when conditions change.
Require venue liaison and contingency reviews for major public appearances. This measure applies to: The detail lacks integration with venue emergency procedures and available support. The control needed to prevent the observed issue is: Refresh destination intelligence and traveler check-in plans when conditions change.